The roof has been covered with plates and felt and is now drying in.
Monthly Archives: April 2016
Another Joist joins
Although most of the floor joists were up, the 1/4 area on the westside, which will have the stairway to the first floor, is still open. Luckily today Hippie Dave showed up to work on that.
The beam shown here was made today and will carry the final 2 joists. For extra strength a pole will be placed where this beam and the other joists meet up
Sometimes stains are good
Usually stains are not a good thing, but this time it is. Staining the logs means coloring them and coating them with a protective layer against sun and rain.
It’s not hard, but takes a lot of time, especially when moving the ladder all the time. Today I’ve done the west side, and 1/3 rd of the north and east side. I started out with just a brush, but that takes forever. Using a airless paint sprayer it’s faster, but back brushing is needed so it’s awkward having to hold a brush, a paint sprayer and hold on to the ladder.
First visitors
The Battalion advances
Today Five men from Battalion Roofing arrived to start the roofing job. Paulette was very helpful in finding this Afghanistan veteran run roofing Company. Although they are super busy after the downpoors of 18″ of rain in Houston,San Antonio and Austin, she persuaded him to come over and do a bid. Unlike Holland, where many houses have a 12/12 pitch (meaning they go up 12 inch every 10 length) or even higher, here pitches are usually lower or even flat. For obvious reasons; why build up if you can go sideways? For me that was simple; logs come in maximum lengths; 24 ft is about as large as Texas cedar gets. So building bigger can only be done by going up, and with a higher pitched roof, less log wall is needed. Anyway, here’s the progress;

On the 8×2″ boards roofing plates will be mounted, with an aluminum foil to reflect heat. On top of that will be standing seam metal roofing;

As you can see this is not flat inbetween the seams but angled, to make it more durable and resistant to hail.
The color will indeed be grey, matching the chink lines inbetween the logs. This should make a nice mix between rustic and modern. The add on 2×6 boards are in place too;
They sting!
I’m getting introduced to more and more things that are typical for Texas; Today I had a up close encounter with a scorpion.
I check my shoes before I put m on, but this morning, at the B&B I put on socks I had put on the evening before after a much needed shower, and had put in my shoes overnight.
Scorpions must have a foot fetish as this one crawled into my sock. As I put the sock on I felt a sting, much like a wasp sting. Luckily scorpions aren’t lethal here, but it isn’t a nice feeling. The lesson here is; check everything you put on unless it comes from a closed environment like a suitcase or sealing cupboard.
These scorpions are small; about 2 inches and tend to crawl where it’s dry and warm. Personally I would not choose a worn sock, but I’m no scorpion.
Soon to be roof
Cash is still king and this is what a roof looks like in 100 dollar bills. Tomorrow this will magically be transformed into an actual roof, first “Decking” (covering the space inbetween rafters with wood and place felt on top to dry in). Then a standing seam metal roof, wich is long lasting and one of the best options out here for roofing.
Thunderstorms
Nailing it
Add on Rafters in place
Today the back rafters were lifted into place with a big crane
It wasn’t easy, as the crane was too big to get around to the back.
So I helped a bit as crane driver and Hippy Dave (Builder from California) could not see eachother; I extended their view and helped to get the rafters in place.
Apart from the front gable, and 2 floor joists, the bearing construction is now finished and ready for roofing and framing. the latter I hope to do myself, up on the 2nd story I may not do it, unless with scaffolding in place.
Meeting roofers tomorrow